Know, during the shift, why the target will be missed
Optimus links the production plan to what every cell and every person actually did, hour by hour. Leaders act at 9:20, not in tomorrow’s meeting.
Plan
Routing by operation on the real working calendar: shift, day off, holiday and each person’s exceptions.
Execute
Reporting on the phone, no paper. Progress is derived from entries, never typed in.
Measure
Actual, expected-by-now, pace and recoverable balance, by department, machine, person and order.
How Optimus decides what to show
Expected by now, not the daily target
At 9:20 the right question is not "how far from 1,227". It is "how much should be done by 9:20 on this cell’s calendar". Optimus answers the second.
Absolute and relative balance
Being 67 pieces behind now and still being able to close the shift are different facts. The monitor shows both, side by side.
One calculation engine
Monitor, dashboards, targets and bonus read the same calculation. The meeting number is the floor number.
The cell leader reports from the phone. The system compares instantly with planned and reported expectations and shows the balance per operation.
What changes when production is measured in real time
Field survey by MESA International among plants that adopted a manufacturing execution system.
or more reduction in cycle time, reported by 60% of plants
or more reduction in data entry time, reported by 60% of plants
or more reduction in shift paperwork, reported by 63% of plants
or more reduction in lead time, reported by half of the plants
MESA International, "The Benefits of MES: from the Field". Third-party results, not Optimus results.
Built to pass an audit
-
Every calculation rule is documented and anchored in code; code and documentation cannot drift apart.
-
Access control by resource and action, enforced server-side. Version history of every business change.
-
Tested isolation per plant or company. Three languages. Web, mobile and installable app.
-
Indicators defined against ISA-95 and ISO 22400.
-
Versioned, exportable records for the evidence ISO 9001 asks for (7.5, 8.5.2 and 9.1).
Start with a diagnosis, not a demo
In a 45-minute conversation we map where your line’s time goes and what Optimus would measure in week one. No commitment.